SPECIAL FEATURES:
- Universal flange adaptor with medium range for metal, AC and PVC pipes, non-restraint.
- Body and compression ring high quality ePOXY powder coated (fusion bonded), coating thickness (DFt min. 250 microns), zero porosity (tested with 3000v), high impact resistance and cross-linkage according to DIN 30677-2 and DIN 3476.
- Hydraulic sealing obtained by compression of gasket between pipe and special seat on body.
- Bolts/nuts/washers from steel, high quality corrosion protected.
- Universal fl ange drilling according to eN 1092-2 PN 10 and PN 16.
- The product is not restraint, anchoring of the pipe is suggested.
MATERIALS:
Body and compression ring:
Ductile iron EN-GJS-400-15 / EN 1563 (former to DIN GGG40)
Gasket:
Rubber, potable water approved
Bolts/nuts/washers:
Steel class 8.8, coated against corrosion
All metal, rubber, and coatings used have been designed for contact with water for human consumption, pursuant to the terms of Italian Health Ministry decree n° 174, dated 6/4/2004.

FLANGE AND CONNECTORS UNIVERSAL FLANGE RACI-RANGE