CARATERISTICHE:

  • Universal connector with medium range for metal, AC and PVC pipes, non-restraint.
  • Body and compression ring high quality EPOXY powder coated (fusion bonded), coating thickness DFT min. 250 microns, zero porosity (tested with 3000V), high impact resistance and cross-linkage according to DIN 30677-2 and DIN 3476.
  • Hydraulic sealing obtained by compression of gasket between pipe and special seat on body.
  • Bolts/nuts/washers from steel, high quality corrosion protected.
  • The product is not restraint, anchoring of the pipe is suggested.

 

MATERIALS:

Body:
Ductile iron EN-GJS-400-15 / EN 1563 (former to DIN GGG40)

Compression ring:
Ductile iron EN-GJS-400-15 / EN 1563 (former to DIN GGG40)

Gasket:
Rubber, potable water approved

Bolts/nuts/washers:
Steel class 8.8, coated against corrosion

 

 

flange e giunti giunto universale raci range 3

All metal, rubber, and coatings used have been designed for contact with water for human consumption, pursuant to the terms of Italian Health Ministry decree n° 174, dated 6/4/2004.


bullet acquedotto   bullet regolazione   bullet piping

RACI Srl

Since more than 70 years on the market, today almost a symbol: RACI built his image of authority and credibility day by day, starting from the design office up to the realization of the venture. Synonymous of reliability and professionalism, RACI has become a reference: research, technology, professional updating and constant care service will allow it to always remain the same over time.   Read more

STAY INFORMED

…”on technical area, new applications and more…”

SEND US A FEEDBACK

If you want to send a tip or simply a question, write in section Contacts

OUR PARTNERS

Find out who is part of the GROUP

raci copyright