Italy

bullet acquedottoFLANGE AND CONNECTORS RESTRAINT FLANGE ADAPTOR RACI-GRIP


MOD. 9100| PN 10/16 | DN  50-300|
Flange for PE/PVC pipes, fully restraint. flange e giunti flangia antisfilamento raci grip 1

flange e giunti flangia antisfilamento raci grip 2

 

 

 

 

SPECIAL FEATURES:

  • Body and compression ring high quality epoxy powder coated (fusion bonded), coating thickness DFt min. 250 microns, zero porosity (tested with 3000v), high impact resistance and cross-linkage according to DIN 30677-2 and DIN 3476.
  • Perfect tightness by back seal hydraulically operating and independent from mechanical clamping of pipe.
  • Special gasket KtW, W270 and eN 681-1 Wa approved.
  • New body design with socket according to eN 1452-2.
  • Flat rubber gasket sticked on fl ange surface to make more easy assembly and simple dismounting.
  • Flange drilling according UNI eN 1092-2 PN 10 and PN 16.
  • Rubber spacer bushes on every bolt of compression ring to clamp the joint

 

MATERIALS:

Body and compression ring:
Ductile iron eN-gJs-400-15 / eN 1563 (former to DIN ggg40)

Gasket:
Rubber, potable water approved

Grip ring:
Brass CuZn40Pb2

Bolts and washers for compression ring:
stainless steel a2-70 eN IsO 3506

Rubber spacer bushes:
Reinforced rubber

 

 

flage e giunti flangia antisfilamento raci grip 3

All metal, rubber, and coatings used have been designed for contact with water for human consumption, pursuant to the terms of Italian Health Ministry decree n° 174, dated 6/4/2004.


bullet acquedotto   bullet regolazione   bullet piping

RACI Srl

Since more than 60 years on the market, today almost a symbol: RACI built his image of authority and credibility day by day, starting from the design office up to the realization of the venture. Synonymous of reliability and professionalism, RACI has become a reference: research, technology, professional updating and constant care service will allow it to always remain the same over time.   Read more

STAY INFORMED

…”on technical area, new applications and more…”

SEND US A FEEDBACK

If you want to send a tip or simply a question, write in section Contacts

OUR PARTNERS

Find out who is part of the GROUP

raci copyright